Skip to content

Lithuania 2023

Lithuania 2023

Project number: 23027/01/01

In March 2023, we rented our tank construction equipment to a company that used our tank building technology to construct a tank for water. This tank is designed to be part of the cooling system for the infrastructure of a heat and power plant in Klaipeda, Lithuania.

Details of the tank built in Klaipeda

  • Diameter: 13.4 m
  • Height: 22.5 m
  • Capacity: 3100 m³
  • Weight: 94 tons
  • Material: Carbon Steel
  • Construction Time: Less than 3 months

The tank was built using our Tank Building System, allowing for efficient and rapid project completion.

For more information, please contact us


“Best solution for tank building ever!”

Customer’s opinion on Nordweld equipment after the completion of the project

See our other projects

Nordweld

Austria 2024

We have completed another project in which we constructed a high-quality stainless steel tank for a pulp and paper factory in the Wolfsberg area.
Read more
Nordweld

France 2024

We are excited to announce the completion of two tanks built with the advanced system for the wine industry in the picturesque Bordeaux region. These modern tanks feature a diameter of 16.47 m and a height of 16.8 m, with an impressive capacity of 3,400 m³. They are made of LDX 2101 material, which ensures exceptional quality and durability.
Read more
Nordweld

Finland 2024

In January 2024, TLC and Nordweld joined forces to collaboratively undertake the construction of a phosphoric acid tank in Finland, emphasizing the comprehensiveness of the project.
Read more

Allow us to introduce our tank building system for you