Uruguay 2020 – 2021
Project number: 21014/02/03
In October 2020, we were part of an ambitious tank construction project in Montevideo, Uruguay, where we supplied equipment for the construction of 11 tanks. This large-scale project involved a variety of tanks made from both stainless steel and carbon steel, with specific designs and volumes suited to the client’s needs. The entire project took 8 months to complete, showcasing the complexity and scale of the task.
Here are the details of the tanks built during the project:
- 3 stainless steel tanks with a height of 20 m, diameter of 19 m, and a volume of 5700 m³ each.
- 1 carbon steel tank with a height of 20 m, diameter of 18.7 m, and a volume of 5500 m³.
- 2 carbon steel tanks with a height of 20 m, diameter of 16.9 m, and a volume of 4500 m³ each.
- 3 carbon steel tanks with a height of 20.3 m, diameter of 13.7 m, and a volume of 2900 m³ each.
- 2 stainless steel tanks with a height of 14.5 m, diameter of 9 m, and a volume of 920 m³ each.
We are proud of our contribution to the successful completion of this significant project in the heart of Uruguay. The tanks built for this project are critical for the client’s infrastructure and operations, highlighting the versatility and efficiency of our tank construction system.
Our innovative equipment and methods ensured a smooth and efficient construction process, meeting the project’s demands for quality, precision, and timely completion.
With this successful project, we continue to demonstrate our leadership in tank construction globally, delivering high-quality solutions tailored to meet the diverse needs of our clients.
For more information, please contact us