Uruguay 2021 – 2022
![Uruguay 2021 – 2022](https://nordweld.eu/app/uploads/2024/12/Uruguay-2021-2022-banner-www.jpg)
Between 2021 and 2022, Nordweld’s tank building system was used to field-erect several tanks in Paso de los Toros.
Project details:
Number of tanks | Diameter | Height | Weight | Capacity | Material |
---|---|---|---|---|---|
2 | 26.7 m | 28 m | 356 t | 15 600 m³ | LDX2101 / CS |
1 | 22.1 m | 26.85 m | 200 t | 10 600 m³ | LDX 2101 |
1 | 19 m | 25.5 m | 115 t | 7100 m³ | LDX 2101 |
5 | 6.5m-12m | 12.3-40.26m | 16 t – 95 t | 530-2800 m3 | 1.4301 / 1.4362 |
- Used tank building system: Advanced System with wheel trolley, bending machine and plate track, Arc Tig welding process of circumference for the stainless-steel tanks and SAW for the carbon steel tanks.
For more information about our tank building technology, please visit our contact page.