We are glad that we can finally boast of the completed project in Montevideo - the capital of Uruguay.
It took 8 months to build 11 tanks, but as you can see in the photos, there was a lot to wait for.
What tanks were part of this project?
- 3 tanks made of stainless steel with a height of 20 m, diameter 19 m and volume 5700 m³
- 1 tank made of carbon steel with a height of 20 m, diameter 18.7 m and volume 5500 m³
- 2 tanks made of carbon steel with a height of 20 m, diameter 16.9 m and volume 4500 m³
- 3 tanks made of carbon steel with a height of 20.3 m, diameter 13.7 m and volume 2900 m³
- 2 tanks made of stainless steel with a height of 14.5 m, diameter 9 m and volume 920 m³