Our next project also takes place in Uruguay, exactly in Paso Del Torres.
From August 2021, 10 tanks are built there with our equipment.
Less than 3 months remain until the end of the project.
This time we are facing more challenging erection.

 

Scope of work - erect 10 tanks

  • 2x 26.7 m diameter / H 28m Volume 15600 m3 LDX2101 / CS
  • 1x 22.1 m diameter / H 26.85 m Volume 10 600 m3 LDX 2101
  • 1x 11m diameter / H15.5m Volume 1470 m3 1.4301
  • 1x 19m diameter / H25.8m Volume 7100 m3 LDX 2101
  • 5x 6.5m-12m / H12.3-40.26m Volume 530-2800 m3 1.4301 / 1.4362

 

The project will be implemented as planned.