Uruguay 2020 – 2021

Nordweld’s tank building system was used from October 2020 until July 2021 to construct 11 tanks as part of a large-scale project in the port of Montevideo.
Project details:
Number of tanks | Diameter | Height | Weight | Capacity | Material |
---|---|---|---|---|---|
3 | 19 m | 20 m | 94,2 t | 5700 m³ | LDX 2101 |
2 | 19 m | 20 m | 107 t | 5500 m³ | carbon steel |
1 | 16,9 m | 20 m | 92 t | 4500 m³ | carbon steel |
3 | 13,7 m | 20,3 m | 77 t | 2900 m³ | carbon steel |
2 | 9 m | 14,5 m | 21,8 m | 920 m³ | stainless steel |
- Used tank building system: Advanced System with wheel trolley, bending machine and plate track, Arc Tig welding process of circumference for the stainless-steel tanks and SAW for the carbon steel tanks.
Contact us for more information about our tank building technology.
Gallery
See our other projects

Austria 2024
We have completed another project in which we constructed a high-quality stainless steel tank for a pulp and paper factory in the Wolfsberg area.

France 2024
We are excited to announce the completion of two tanks built with the advanced system for the wine industry in the picturesque Bordeaux region. These modern tanks feature a diameter of 16.47 m and a height of 16.8 m, with an impressive capacity of 3,400 m³. They are made of LDX 2101 material, which ensures exceptional quality and durability.